Hydrogen • For a Better World

Clean Energy
Without Disruption

Hydrogen augmentation technology for industrial boilers and diesel generators — deployed in hours, not days. No replacement. No overhaul.

Explore Products How It Works
15%
Average fuel saving
80%
Carbon reduction possible
8 hrs
Typical retrofit time
0
Engine modifications required
The Technology

Brown Gas augments combustion at the source

UDJAN's on-demand electrolysis generates Brown Gas (HHO) exactly when needed. No high-pressure storage. No transportation risk. The gas is fed directly into the air intake and burns completely alongside existing fuel — improving efficiency instantly.

Full technical explanation →
01

Water electrolysis on-site

Distilled water is split into Brown Gas (H₂ + O) on demand. No storage of compressed gas at any point.

02

Gas enters air intake ↓

Brown Gas is introduced into the combustion air stream alongside the existing fuel — diesel or solid fuel.

03

Complete, cleaner combustion

Brown Gas enhances the burn — reducing unburnt fuel, lowering emissions, and improving overall efficiency.

04

Results visible immediately

Reduced fuel consumption, cleaner exhaust, and lower stack temperatures — measurable from day one.


Product Range

Hydrogen augmentation
for every application

Payback typically 8–24 months. All systems are field-tested and proven in live industrial installations.

Industrial Boiler System
Industrial Boilers

Boiler HHO Systems

Wood-fired and oil-fired boiler augmentation. 10–20% fuel saving. Retrofit in hours with no boiler modification.

Explore boiler systems →
DG Set HHO System
Diesel Generators

DG Set HHO Modules

125 KVA to 2250 KVA. Up to 80% carbon reduction. Field-tested across a range of industrial generator sets.

Explore DG modules →
Mobility Retrofit Kit
Mobility

Retrofit Kits

BS6-compliant retrofit kits for commercial vehicles and passenger cars. Improved mileage, reduced emissions.

Explore mobility kits →

Why UDJAN

Real advantages.
Measurable results.

Proven performance across industrial boilers, generators, and commercial vehicles.

No Storage. No Risk.

Brown Gas is generated on-demand by electrolysis and consumed immediately. UDJAN systems have zero high-pressure gas storage and zero transportation of compressed hydrogen — eliminating the biggest safety risk in hydrogen deployment.

Retrofit in Hours

A trained UDJAN technician completes the full installation in a single working day — typically 4–8 hours. Your boiler or generator does not need to be modified, rebuilt, or replaced.

📈

Immediate Fuel Savings

Performance improvement is measurable from the first operating cycle post-installation. Most installations show 10–20% fuel reduction within the first week of operation.

🌿

Up to 80% Carbon Reduction

Brown Gas combustion produces water vapour as a byproduct. Combined with improved fuel combustion efficiency, CO and carbon particulate emissions drop significantly — measured and confirmed on every installation.

🔨

Zero Engine Modification

UDJAN systems bolt on externally. Internal engine and boiler components are not touched, modified, or replaced. Existing warranties remain intact. Removal is as simple as installation.

💷

8–24 Month Payback

At current diesel and fuel prices, UDJAN installations across boilers and generator sets typically pay back the capital investment within 8 to 24 months — then generate ongoing fuel savings indefinitely.


Industries Served

Deployed across
Indian industry

Any application that burns fuel can benefit from UDJAN augmentation.

Paper & Pulp
Textiles
Food Processing
Data Centres
Hospitality
Healthcare
Commercial Transport
Manufacturing
Real Estate
Agriculture
Mining
Logistics
View all industries →
Get Started

Ready to reduce your
fuel costs today?

Talk to our team about your boiler or generator requirements. Site survey and assessment at no charge.

Talk to us